Wacker Neuson BTS 635s Manual do Operador Página 53

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 52
BTS 630, 635 10 Maintenance
Operator's manual 53
10.3.3 Tightening the V-belt
Performing preparations
1. Switch off the engine.
Tightening the V-belt
1. Loosen both of the belt guard screws a few turns.
2. Rotate the adjusting screw clockwise until the square nut is flush with the
mark.
3. Tighten both belt guard screws.
Torque 25 Nm.
Item Designation Item Designation
1 Screw (2 pieces) 3 Square nut
2 Adjusting screw
Vista de página 52
1 2 ... 48 49 50 51 52 53 54 55 56 57 58 ... 79 80

Comentários a estes Manuais

Sem comentários